Town of Los Altos Hills
Los Altos, CA
SES designed, engineered, permitted, and is in construction of this battery energy storage (BESS) resilience system project utilizing the approved conceptual design from the October 21, 2021 Town Council meeting.
An upgraded utility service was also included in this project and is located at the new equipment pad adjacent to a previously existing generator. The AC distribution cables for both the PV solar and generator were routed to a newly installed switchgear. The previous service became an 800 AMP sub panel fed from the new switchgear.